Shelburne Vineyard
|
home
April 26, 2007
East (front) Elevation
(Facing US RT7)
Height of side walls in processing area: 16 ft. with ceiling sloping upwards to ridge line of roof
(
Note: Supporting post for north-end roof overhang not drawn in)
West Elevation
South
Elevation
(Showing solar panel option)
North Elevation
(Crush pad)